Projects
Municipal Landfills

Tailings Seepage
CERCLA Feasibility Study
Desulfurization Ponds
City of Industry, CA
Earthen Cover Design
Hydroelectric Pump-Back
Trona Mine Dewatering

NPL Site Remediation
UST Petroleum Release
TMDL Analysis
Regional Aquifer Cleanup
In-Situ Remediation
Acid Mine Drainage
Groundwater Flow Simulation
Waste Water Handling

Water Resources Assessment
Water Rights Development
Water Supply Assessment

Clients

Philosophy/Approach

Key Staff

Movies, Charts, & Presentations
Technical Papers
Newsletter

Links

Employment

ANNOUNCEMENTS

Newly Appointed:

Hydro Geo Chem, Inc. is pleased to announce the appointment of Abra J. Bentley as President. Abra received her M.S. in environmental engineering in 1994.  She worked as a project scientist at HGC from 1997 through 1999, at which point she left to pursue other interests.  From 2000 to 2004 she was a research engineer at Bend Research, a pharmaceutical research company.  At the end of 2004, Abra returned to environmental work and to HGC.

At Hydro Geo Chem, Abra served as project manager for a Phase III Pilot Scale Study and on-going remedial efforts for LUST petroleum hydrocarbon contamination at West Sky Harbor Airport in Phoenix, Arizona.  She has managed site investigations that have included collection and interpretation of chemical, hydrogeologic, and bioremedial systems data.  Abra has taken part in corporate matters and has been on the Board of Directors of HGC since 2008.

 

HYDRO GEO CHEM, INC.
51 West Wetmore Road, Suite 101, Tucson, AZ 85705-1678

Toll Free (800) 727-5547, Tel. (520) 293-1500, Fax (520) 293-1550, Email contact@hgcinc.com

6370 East Thomas Road, Suite 200, Scottsdale, Arizona 85251-7056
(480) 421-1501, Fax (480) 425-8794
 
Hydro Geo Chem, Inc. assumes no responsibility for the consequences of reliance by others on the
information provided on this web site
Copyright © 2011 - by Hydro Geo Chem, Inc., all rights reserved